October 25, 2026
Phone battery stock planning: model mix, cover weeks and reorder points

Most replacement-battery stock problems are not supplier problems. They come from reordering by memory: a popular model is remembered for months, a slow model is forgotten until a customer is waiting, and the same short code gets ordered twice while another reference sits empty. A model-level plan turns ordering into a calculation you can repeat, and it is the part of wholesale purchasing that most improves restocking accuracy.
This guide sets out a workable method for repair shops and distributors: how to build the model list, how to set cover weeks per model, how to calculate a reorder point, and which figures to record so the next order is faster than the last one. It is written for the buyer who already knows which device families they service. Nothing here depends on a specific supplier’s terms — delivery timing, order minimums and packaging conditions are commercial facts that belong in a written quotation, not in a stock model.
Step 1: build the model list from counted replacements, not impressions
Start with what actually left the counter. For each battery model you have fitted in the last four weeks, count the units. If your records are thin, count the batteries currently on the shelf instead and use that as a starting point. The aim is a per-model number you can defend, even if it is approximate, rather than a feeling that one model is “popular”.
Keep the model code exactly as it appears on the label or your supplier’s listing. Short codes are the main source of ordering mistakes: two batteries from different families can carry similar-looking codes, and the code alone rarely tells you the capacity or the voltage. Where a model has a standard-capacity and a high-capacity version, treat them as two separate lines in the plan and count them separately on the shelf.
Step 2: set cover weeks per model, not one rule for everything
Cover weeks is how many weeks of expected demand you want to hold on the shelf. A single number for every model wastes shelf space on slow references and creates stock-outs on fast ones. A simple three-tier structure works for most shops:
| Demand tier | How to recognise it | Typical cover to hold | What it means operationally |
|---|---|---|---|
| Fast movers | Counted replacements each week, several device families | Longer cover, reviewed often | Never run out; these are the models that damage reputation when they are missing |
| Steady models | Counted most weeks, one or two device families | Medium cover | Order when the reorder point is reached, not when you remember |
| Slow or occasional | Fitted a few times a quarter, or only for a specific device | Short cover, or order to order | Hold little, or buy against a customer request |
These cover levels are a starting point for a plan, not a rule about anyone else’s business. Adjust them as you record what actually happens: if a fast model repeatedly runs out before the next order, extend its cover; if a slow model has been sitting untouched for two quarters, shorten it or drop it from the standing order.
Step 3: calculate the reorder point
The reorder point is the stock level at which you place the order. It is the average weekly demand for that model multiplied by the cover weeks you have chosen, plus a small allowance for the delay between placing an order and receiving it. The delay figure must come from your own confirmed terms — the same written confirmation you would use in an enquiry — so keep it with the model’s record.
Here is a worked example. The numbers are illustrative only and do not describe any particular supplier or customer.
| Model | Fitted in last 4 weeks | Weekly average | Cover weeks | Reorder point | On hand | Action |
|---|---|---|---|---|---|---|
| Model A (fast mover) | 16 | 4 | 4 | 16 | 11 | Order now |
| Model B (steady) | 6 | 1.5 | 3 | 5 | 6 | Hold |
| Model C (occasional) | 1 | 0.25 | 0 | 0 | 2 | Order to order |
Two things this worksheet makes visible. First, a model can be in stock and still need an order: Model A has eleven units on the shelf and a reorder point of sixteen. Second, “occasional” models do not need stock at all — Model C is bought when a customer needs it, which removes the slow-moving units that quietly tie up cash.
Step 4: record the fields that make the next order fast
The stock plan only works if each line carries enough information to be ordered again without a fresh investigation. For every model in the plan, keep a short record with these fields:
| Field | Why it matters | Where it comes from |
|---|---|---|
| Model code and artwork text | Prevents ordering a different part with a similar code | The battery label and the product page you buy from |
| Label capacity and nominal voltage | Lets you compare like with like and spot a mislabelled offer | Verified product artwork, not a catalogue thumbnail |
| Charge-limit voltage | Frequently mistaken for the nominal voltage when writing a specification | The same artwork, kept as a separate field |
| Buyer SKU or bin location | Makes shelf counts and picking reliable | Your own labelling |
| Approved sample reference | Stops a reorder drifting from the specification you signed off | Your dated sample approval record |
| Last confirmed lead time and order minimum | Turns the reorder point into a number instead of an estimate | The supplier’s written answer to your enquiry |
Two of these deserve emphasis. The label capacity and nominal voltage should be taken from verified artwork, and the charge-limit voltage is a different number that is easy to write into a specification by mistake. And the approved sample reference matters because most ordering errors are not picking errors — they are ordering errors where a reorder quietly drifts from the configuration that was approved. Our guide to reading a replacement battery label covers the field-by-field check, including a worked example of a catalogue label whose watt-hour figure does not agree with its own capacity and voltage.
Step 5: run the review cycle on a fixed rhythm
A weekly shelf count and a monthly model-mix review is enough for most shops. The weekly count only needs to record the quantity on hand for each model in the plan — the reorder decision follows from the worksheet. The monthly review is where the plan improves: move models between tiers, drop models that have not been fitted, and check that the cover weeks still match reality.
Keep the counting separate from the ordering paperwork. When you place the order, use the mixed-model order list so every model is a separate line with its own quantity, and use the wholesale RFQ template to request product, packaging and shipping scope in a comparable way between suppliers. When the shipment arrives, log it against the model and the lot reference in the receiving and after-sales record, so a specification question months later can be answered.
Where to source the models on your list
When the plan asks for a model you do not stock yet, the catalogue pages carry the label values for each reference: the BN980 for Samsung (4300 mAh, 3.88 V), the BM526 for Samsung (5000 mAh, 3.88 V), the BA505 for Samsung (4000 mAh, 3.85 V) and the B-G1 for vivo (3700 mAh, 3.85 V). Availability, order minimums, delivery timing and after-sales conditions are confirmed in writing for each enquiry, and samples can be requested before a bulk order is committed.

Send your model list with quantities and destination through the DoctorIT quotation page, and keep the resulting confirmation with the model record so the next reorder needs no new investigation. Battery installation and handling should be carried out by trained technicians.
When a supplier quotes a cycle-life or shelf-life figure, ask for the method behind it before you compare it with another offer — the cycle life and shelf life guide sets out what those figures depend on and which parts are checked from the product itself.
Depth per reference comes from your own demand data; the device list guide covers how to turn a service history into the list you order from.
The unit you order in affects how much stock you have to hold for the same demand; the buying unit guide covers how to state the unit and what it changes.
Keep the charge-up voltage next to the reference in the stock file, so that a repeat order brings the same cell; the charge-up voltage guide explains why it belongs there.
